{"id":15223,"date":"2025-05-08T08:19:51","date_gmt":"2025-05-08T15:19:51","guid":{"rendered":"https:\/\/www.yakimawa.gov\/media\/news\/?p=15223"},"modified":"2025-05-08T08:19:51","modified_gmt":"2025-05-08T15:19:51","slug":"sewer-repairs-to-impact-nob-hill-boulevard","status":"publish","type":"post","link":"https:\/\/www.yakimawa.gov\/media\/news\/sewer-repairs-to-impact-nob-hill-boulevard\/","title":{"rendered":"Sewer Repairs to Impact Nob Hill Boulevard"},"content":{"rendered":"\n<p>Nob Hill Boulevard will be reduced to two lanes between 16<sup>th<\/sup> Avenue and 12<sup>th<\/sup> Avenue tomorrow, Friday, for sewer repairs.<\/p>\n\n\n\n<p>Traffic control will begin at 9:00 am Friday, May 9<sup>th<\/sup>, and traffic will be limited to two lanes until work is completed on this section of Nob Hill Boulevard. It\u2019s anticipated work will be complete by around 9:00 pm Friday.<\/p>\n\n\n\n<p>Access will be maintained to properties in the project area.<\/p>\n\n\n\n<p>Traffic delays in the project area are likely to occur.&nbsp;Drivers should use alternate routes if possible until the project is completed.&nbsp;<\/p>\n\n\n\n<p>As always, the schedule for this type of project is subject to change daily dependent on weather, equipment failure, and emergencies.<\/p>\n\n\n\n<p>For more about the project call City of Yakima Chief Engineer Dana Kallevig at 509-575-6048.<\/p>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-5579aab3-1ea6-4f92-ba55-acf749c967e7\" href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Nob-Hill-Blvd-Sewer-Repairs-News-Release.pdf\">Nob Hill Blvd Sewer Repairs &#8211; News Release<\/a><a href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Nob-Hill-Blvd-Sewer-Repairs-News-Release.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-5579aab3-1ea6-4f92-ba55-acf749c967e7\">Download<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Nob Hill Boulevard will be reduced to two lanes between 16th Avenue and 12th Avenue tomorrow, Friday, for sewer repairs. Traffic control will begin at 9:00 am Friday, May 9th, and traffic will be limited to two lanes until work is completed on this section of Nob Hill Boulevard. It\u2019s anticipated work will be complete<\/p>\n","protected":false},"author":10,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-15223","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/15223","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/comments?post=15223"}],"version-history":[{"count":1,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/15223\/revisions"}],"predecessor-version":[{"id":15225,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/15223\/revisions\/15225"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/media?parent=15223"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/categories?post=15223"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/tags?post=15223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}