{"id":16083,"date":"2026-04-13T08:24:10","date_gmt":"2026-04-13T15:24:10","guid":{"rendered":"https:\/\/www.yakimawa.gov\/media\/news\/?p=16083"},"modified":"2026-04-13T08:24:11","modified_gmt":"2026-04-13T15:24:11","slug":"watch-for-road-lane-closures-at-fair-ave-nob-hill-intersection","status":"publish","type":"post","link":"https:\/\/www.yakimawa.gov\/media\/news\/watch-for-road-lane-closures-at-fair-ave-nob-hill-intersection\/","title":{"rendered":"Watch for Road, Lane Closures at Fair Ave\/Nob Hill Intersection"},"content":{"rendered":"\n<p>Drivers&nbsp;are&nbsp;encountering&nbsp;the following at the intersection of Fair Avenue and Nob Hill Boulevard starting this morning, Monday, April 13<sup>th<\/sup>, and continuing through the end of April:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fair Avenue\u00a0is\u00a0completely closed at the intersection. A detour route\u00a0is\u00a0available via E. Mead Avenue and Pacific Avenue.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Nob Hill Boulevard\u00a0is\u00a0one lane each way through the intersection. The signal\u00a0is\u00a0turned off during the Fair Avenue closure, allowing Nob Hill traffic to go through the intersection unimpeded.\u00a0<\/li>\n<\/ul>\n\n\n\n<p>The above closures are in effect 24\/7 through April 30<sup>th<\/sup>. They are&nbsp;required&nbsp;so crews can complete roadway surfacing for a Nob Hill\/Fair Avenue project that began last year.&nbsp;<\/p>\n\n\n\n<p>Access is maintained to properties in the project area.<\/p>\n\n\n\n<p>Drivers are asked to consider alternate routes&nbsp;if&nbsp;possible&nbsp;during these closures as there will be traffic delays. If driving through the project area, please&nbsp;proceed&nbsp;with caution.&nbsp;<\/p>\n\n\n\n<p>As always, the schedule for this type of project is subject to change daily dependent on weather, equipment failure, and emergencies.&nbsp;<strong>&nbsp;<\/strong>&nbsp;<\/p>\n\n\n\n<p>For more about the project call City of Yakima Chief Engineer Dana Kallevig at 509-575-6048.&nbsp;&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Drivers&nbsp;are&nbsp;encountering&nbsp;the following at the intersection of Fair Avenue and Nob Hill Boulevard starting this morning, Monday, April 13th, and continuing through the end of April:&nbsp; The above closures are in effect 24\/7 through April 30th. They are&nbsp;required&nbsp;so crews can complete roadway surfacing for a Nob Hill\/Fair Avenue project that began last year.&nbsp; Access is maintained<\/p>\n","protected":false},"author":10,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-16083","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/16083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/comments?post=16083"}],"version-history":[{"count":2,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/16083\/revisions"}],"predecessor-version":[{"id":16085,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/16083\/revisions\/16085"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/media?parent=16083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/categories?post=16083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/tags?post=16083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}