{"id":16142,"date":"2026-05-29T13:47:08","date_gmt":"2026-05-29T20:47:08","guid":{"rendered":"https:\/\/www.yakimawa.gov\/media\/news\/?p=16142"},"modified":"2026-05-29T13:47:08","modified_gmt":"2026-05-29T20:47:08","slug":"utility-road-and-sidewalk-work-to-impact-nob-hill-traffic","status":"publish","type":"post","link":"https:\/\/www.yakimawa.gov\/media\/news\/utility-road-and-sidewalk-work-to-impact-nob-hill-traffic\/","title":{"rendered":"Utility, Road, and Sidewalk Work to Impact Nob Hill Traffic"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A project to replace a water main line, grind and pave roadway sections, and repair sidewalks will impact daytime traffic along a section of Nob Hill Boulevard through the summer and into fall.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The work will be done on the portion of Nob Hill between 28<sup>th<\/sup> Avenue and 40<sup>th<\/sup> Avenue.&nbsp; Traffic along that section of Nob Hill will be impacted between 7:00 am and 3:30 pm weekdays from June 1<sup>st<\/sup> through October.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traffic will be reduced to one lane in each direction&nbsp;in the&nbsp;active&nbsp;project&nbsp;area.&nbsp; Business access will be maintained throughout project duration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Additionally, drivers are encouraged to slow down and proceed cautiously through the work zone.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Access to homes and businesses in the project area will be maintained as best as possible and emergency vehicles will be allowed through the project area if necessary.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The primary contractor for the project is Yakima-based TTC Construction, Inc.&nbsp; The project is being paid for with federal funds and the City\u2019s water mainline replacement fund.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As always, the schedule for this type of project is subject to change daily dependent on weather, equipment failure, and emergencies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For more information about the project, contact Construction Supervisor Nick Rogers at 509-575-6226.<\/p>\n\n\n\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\" hidden class=\"wp-block-file__embed\" data=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Utility-Road-and-Sidewalk-Repairs-on-Nob-Hill-News-Release.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"Embed of Utility, Road, and Sidewalk Repairs on Nob Hill - News Release.\"><\/object><a id=\"wp-block-file--media-ace79c83-853f-4e3a-8fa4-42d758717f43\" href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Utility-Road-and-Sidewalk-Repairs-on-Nob-Hill-News-Release.pdf\">Utility, Road, and Sidewalk Repairs on Nob Hill &#8211; News Release<\/a><a href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Utility-Road-and-Sidewalk-Repairs-on-Nob-Hill-News-Release.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-ace79c83-853f-4e3a-8fa4-42d758717f43\">Download<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>A project to replace a water main line, grind and pave roadway sections, and repair sidewalks will impact daytime traffic along a section of Nob Hill Boulevard through the summer and into fall. The work will be done on the portion of Nob Hill between 28th Avenue and 40th Avenue.&nbsp; Traffic along that section of<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-16142","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/16142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/comments?post=16142"}],"version-history":[{"count":1,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/16142\/revisions"}],"predecessor-version":[{"id":16144,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/16142\/revisions\/16144"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/media?parent=16142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/categories?post=16142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/tags?post=16142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}