{"id":16297,"date":"2026-11-06T14:35:52","date_gmt":"2026-11-06T22:35:52","guid":{"rendered":"https:\/\/www.yakimawa.gov\/media\/news\/?p=16297"},"modified":"2026-11-06T14:35:52","modified_gmt":"2026-11-06T22:35:52","slug":"infrastructure-project-to-impact-traffic-on-nob-hill-next-week-2","status":"publish","type":"post","link":"https:\/\/www.yakimawa.gov\/media\/news\/infrastructure-project-to-impact-traffic-on-nob-hill-next-week-2\/","title":{"rendered":"Infrastructure Project to Impact Traffic on Nob Hill Next Week"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Improvements to a water main and roadway surfaces are continuing to impact traffic on a portion of Nob Hill Boulevard.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Final paving on Nob Hill between 28<sup>th<\/sup> Avenue to 40<sup>th<\/sup> Avenue will begin on November 10<sup>th<\/sup> and is scheduled to be completed by November 12<sup>th<\/sup>.&nbsp; Paving will take place between 7:00 am and 5:30 pm.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While the paving is underway, lanes will be narrowed intermittently.&nbsp; Traffic will be controlled through the project area by flaggers.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Drivers should expect localized traffic and parking impacts in the area and are encouraged to slow down and proceed cautiously through work zones.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Access to homes and businesses in the project area will be maintained as best as possible and emergency vehicles will be allowed through the project area if necessary.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As always, the schedule for this type of project is subject to change daily dependent on weather, equipment failure, and emergencies.<\/p>\n\n\n\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\" hidden class=\"wp-block-file__embed\" data=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Nob-Hill-Infrastructure-Project-News-Release-2.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"Embed of Nob Hill Infrastructure Project - News Release.\"><\/object><a id=\"wp-block-file--media-1c19701a-09ae-47e0-a226-eecdf10c1153\" href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Nob-Hill-Infrastructure-Project-News-Release-2.pdf\">Nob Hill Infrastructure Project &#8211; News Release<\/a><a href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Nob-Hill-Infrastructure-Project-News-Release-2.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-1c19701a-09ae-47e0-a226-eecdf10c1153\">Download<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Improvements to a water main and roadway surfaces are continuing to impact traffic on a portion of Nob Hill Boulevard. Final paving on Nob Hill between 28th Avenue to 40th Avenue will begin on November 10th and is scheduled to be completed by November 12th.&nbsp; Paving will take place between 7:00 am and 5:30 pm.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-16297","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/16297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/comments?post=16297"}],"version-history":[{"count":1,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/16297\/revisions"}],"predecessor-version":[{"id":16299,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/16297\/revisions\/16299"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/media?parent=16297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/categories?post=16297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/tags?post=16297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}