{"id":4225,"date":"2017-02-28T12:18:24","date_gmt":"2017-02-28T20:18:24","guid":{"rendered":"https:\/\/www.yakimawa.gov\/media\/news\/?p=4225"},"modified":"2017-02-28T12:18:24","modified_gmt":"2017-02-28T20:18:24","slug":"sewer-pipe-leak-leads-temporary-closure-section-pleasant","status":"publish","type":"post","link":"https:\/\/www.yakimawa.gov\/media\/news\/sewer-pipe-leak-leads-temporary-closure-section-pleasant\/","title":{"rendered":"Sewer Pipe Leak Leads to Temporary Closure of a Section of Pleasant"},"content":{"rendered":"<p>The section of Pleasant Avenue between Washington Avenue and Spokane Street is temporarily closed to through traffic due to roadway damage caused by a sewer pipe leak.<\/p>\n<p>The sewer pipe leak has caused soil below the roadway to erode.\u00a0 As a result, asphalt pavement has collapsed.<\/p>\n<p>Repairs to the leaking sewer pipe should begin within the next few days.\u00a0 Once the pipe is fixed, the eroded soil will be replaced, the roadbed will be restored, and temporary pavement repairs will be made.\u00a0 No estimate has been made at this point regarding when all of the necessary repairs may be completed.<\/p>\n<p>During the temporary closure of Pleasant Avenue between Washington Avenue and Spokane Street, traffic delays in the area are likely to occur.\u00a0 Drivers should use alternate routes until the project is completed.<\/p>\n<p>Access to homes in the area will be maintained as best as possible.<\/p>\n<p>For additional information about the temporary closure of a Section of Pleasant Avenue, contact Streets and Traffic Operations Manager Joe Rosenlund at 576-6430.<\/p>\n<p><a href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Pleasant-Avenue-Temporary-Closure-News-Release.pdf\">Pleasant Avenue Temporary Closure &#8211; News Release<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The section of Pleasant Avenue between Washington Avenue and Spokane Street is temporarily closed to through traffic due to roadway damage caused by a sewer pipe leak. The sewer pipe leak has caused soil below the roadway to erode.\u00a0 As a result, asphalt pavement has collapsed. Repairs to the leaking sewer pipe should begin within<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4225","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/4225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/comments?post=4225"}],"version-history":[{"count":1,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/4225\/revisions"}],"predecessor-version":[{"id":4227,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/4225\/revisions\/4227"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/media?parent=4225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/categories?post=4225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/tags?post=4225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}