{"id":44,"date":"2013-03-07T09:19:24","date_gmt":"2013-03-07T17:19:24","guid":{"rendered":"https:\/\/www.yakimawa.gov\/media\/news\/?p=44"},"modified":"2013-03-12T09:20:33","modified_gmt":"2013-03-12T16:20:33","slug":"sewer-line-installation-will-close-section-of-beech-street-for-a-month","status":"publish","type":"post","link":"https:\/\/www.yakimawa.gov\/media\/news\/sewer-line-installation-will-close-section-of-beech-street-for-a-month\/","title":{"rendered":"Sewer Line Installation Will Close Section of Beech Street for a Month"},"content":{"rendered":"<p><strong>Contact:<\/strong> Construction Supervisor Bruce Floyd \u2013 575-6138<br \/>\nCommunity Relations Manager Randy Beehler \u2013 901-1142 \u2013 <a href=\"mailto:randy.beehler@yakimawa.gov\">randy.beehler@yakimawa.gov<\/a><\/p>\n<p>A section of Beech Street will be closed from now until at least Friday, April 5<sup>th<\/sup> while a project is underway to install a City of Yakima sewer line.<\/p>\n<p>The section of the roadway that will be closed extends from the Beech Street underpass, which is below Interstate 82, to 15<sup>th<\/sup> Street.<\/p>\n<p>During the project, traffic delays in the area are likely to occur.\u00a0 Drivers should use alternate routes if possible until the project is completed.<\/p>\n<p>Access to homes and businesses in the area, including Central Premix and Arreolas Auto Wrecking, will be maintained from Chalmers Street.\u00a0 Emergency vehicles will be allowed through the project area if necessary.<\/p>\n<p>As always, the schedule for this type of project is subject to change daily, dependant on weather, equipment failure, and emergencies.<\/p>\n<p>For additional information regarding this project, contact Construction Supervisor Bruce Floyd at 575-6138.<\/p>\n<p><a href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Sewer-Line-Installation-7-7-13.pdf\">Sewer Line Installation (pdf)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contact: Construction Supervisor Bruce Floyd \u2013 575-6138 Community Relations Manager Randy Beehler \u2013 901-1142 \u2013 randy.beehler@yakimawa.gov A section of Beech Street will be closed from now until at least Friday, April 5th while a project is underway to install a City of Yakima sewer line. The section of the roadway that will be closed extends<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-44","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/44","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/comments?post=44"}],"version-history":[{"count":2,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/44\/revisions"}],"predecessor-version":[{"id":47,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/44\/revisions\/47"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/media?parent=44"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/categories?post=44"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/tags?post=44"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}