{"id":48,"date":"2013-03-07T09:21:52","date_gmt":"2013-03-07T17:21:52","guid":{"rendered":"https:\/\/www.yakimawa.gov\/media\/news\/?p=48"},"modified":"2013-03-12T09:22:44","modified_gmt":"2013-03-12T16:22:44","slug":"wastewater-line-installation-project-will-close-parts-of-6th-avenue","status":"publish","type":"post","link":"https:\/\/www.yakimawa.gov\/media\/news\/wastewater-line-installation-project-will-close-parts-of-6th-avenue\/","title":{"rendered":"Wastewater Line Installation Project Will Close Parts of 6th Avenue"},"content":{"rendered":"<p><strong>Contact:<\/strong> Utility Engineer Shelley Willson \u2013 576-6303<br \/>\nCommunity Relations Manager Randy Beehler \u2013 901-1142 \u2013 <a href=\"mailto:randy.beehler@yakimawa.gov\">randy.beehler@yakimawa.gov<\/a><\/p>\n<p>An ongoing wastewater line installation project will result in the temporary closure of a section of 6<sup>th<\/sup> Avenue.\u00a0 Starting on Friday, March 8<sup>th<\/sup>, North 6<sup>th<\/sup> Avenue from Fruitvale Boulevard to River Road will be closed to traffic and a detour route will be in place to direct drivers around the work zone.\u00a0 The closure is expected to last until late March.<\/p>\n<p>Crews from TTC Construction, a Yakima-based contracting firm, will be working to install the 12-inch diameter line in North 6<sup>th<\/sup> Avenue.\u00a0 Work will included a deep trench operation for the installation of the pipeline on 6<sup>th<\/sup> Avenue between \u201cI\u201d Street and Madison Avenue.<\/p>\n<p>Traffic controls will be in place while the project is underway to help drivers navigate the detour route.\u00a0 \u201cI\u201d Street between 5<sup>th<\/sup> Avenue and 6<sup>th<\/sup> Avenue will also remain closed until construction equipment is not obstructing the intersection of 6<sup>th<\/sup> Avenue and \u201cI\u201d Street.<\/p>\n<p>During the project, traffic delays in the area are likely to occur.\u00a0 Drivers should use alternate routes if possible until the project is completed.<\/p>\n<p>Access to businesses in the area will be maintained and emergency vehicles will be allowed through the project area if necessary.<\/p>\n<p>As always, the schedule for this type of project is subject to change daily, dependant on weather, equipment failure, and emergencies.<\/p>\n<p>For additional information regarding this project, contact Utility Engineer Shelley Willson at 576-6303.<\/p>\n<p><a href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Wastewater-Line-Installation-7-7-13.pdf\">Wastewater Line Installation (pdf)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contact: Utility Engineer Shelley Willson \u2013 576-6303 Community Relations Manager Randy Beehler \u2013 901-1142 \u2013 randy.beehler@yakimawa.gov An ongoing wastewater line installation project will result in the temporary closure of a section of 6th Avenue.\u00a0 Starting on Friday, March 8th, North 6th Avenue from Fruitvale Boulevard to River Road will be closed to traffic and a<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-48","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/48","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/comments?post=48"}],"version-history":[{"count":2,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/48\/revisions"}],"predecessor-version":[{"id":51,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/48\/revisions\/51"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/media?parent=48"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/categories?post=48"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/tags?post=48"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}