{"id":5763,"date":"2018-04-20T14:12:49","date_gmt":"2018-04-20T21:12:49","guid":{"rendered":"https:\/\/www.yakimawa.gov\/media\/news\/?p=5763"},"modified":"2018-04-20T14:13:41","modified_gmt":"2018-04-20T21:13:41","slug":"water-service-line-install-to-restrict-traffic-on-south-1st-stree","status":"publish","type":"post","link":"https:\/\/www.yakimawa.gov\/media\/news\/water-service-line-install-to-restrict-traffic-on-south-1st-stree\/","title":{"rendered":"Water Service Line Install to Restrict Traffic on South 1st Street"},"content":{"rendered":"<p>Water service line repairs will result in traffic restrictions on South 1<sup>st<\/sup> Street between Nob Hill Boulevard and Arlington Street from Monday, April 23<sup>rd<\/sup> through Friday, April 27<sup>th<\/sup>. \u00a0Work on the project will begin at 7:00 am and last until 3:30 pm each day.<\/p>\n<p>Traffic will be limited to one lane in both directions in the project area. Because of heavy traffic volumes on South 1<sup>st<\/sup> Street, drivers can expect delays. Drivers should use alternate routes if possible until the work is completed.<\/p>\n<p>Drivers are reminded that the speed limit through all traffic-related works zones within the City of Yakima is 20 miles-per-hour.<\/p>\n<p>Access to homes and businesses in the project area will be maintained as best as possible and emergency vehicles will be allowed through the project area if necessary.<\/p>\n<p>As always, the schedule for this type of project is subject to change daily dependent on weather, equipment failure, and emergencies.<\/p>\n<p>For more information about the project, contact Water Distribution Supervisor Emilio Lopez at 575-6196.<\/p>\n<p><a href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Water-Line-Repairs-to-Impact-1st-Street-Traffic-News-Release.pdf\">Water Line Repairs to Impact 1st Street Traffic &#8211; News Release<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Water service line repairs will result in traffic restrictions on South 1st Street between Nob Hill Boulevard and Arlington Street from Monday, April 23rd through Friday, April 27th. \u00a0Work on the project will begin at 7:00 am and last until 3:30 pm each day. Traffic will be limited to one lane in both directions in<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-5763","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/5763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/comments?post=5763"}],"version-history":[{"count":2,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/5763\/revisions"}],"predecessor-version":[{"id":5766,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/5763\/revisions\/5766"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/media?parent=5763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/categories?post=5763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/tags?post=5763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}