{"id":73,"date":"2013-02-21T09:42:04","date_gmt":"2013-02-21T17:42:04","guid":{"rendered":"https:\/\/www.yakimawa.gov\/media\/news\/?p=73"},"modified":"2014-04-16T11:40:22","modified_gmt":"2014-04-16T18:40:22","slug":"wastewater-line-installation-will-close-portions-of-i-street-and-j-street","status":"publish","type":"post","link":"https:\/\/www.yakimawa.gov\/media\/news\/wastewater-line-installation-will-close-portions-of-i-street-and-j-street\/","title":{"rendered":"Wastewater Line Installation Will Close Portions of &#8220;I&#8221; Street and &#8220;J&#8221; Street"},"content":{"rendered":"<p><strong>Contact:<\/strong> Utility Engineer Shelley Willson \u2013 576-6303<br \/>\nCommunity Relations Manager Randy Beehler \u2013 901-1142 \u2013 <a href=\"mailto:randy.beehler@yakimawa.gov\">randy.beehler@yakimawa.gov<\/a><\/p>\n<p>\u201cI\u201d Street between 6<sup>th<\/sup> Avenue and 1<sup>st<\/sup> Street will be open to \u201cLocal Traffic Only\u201d on Saturday, February 23rd and Sunday, February 24th, 2013.\u00a0 The center of the roadway will be blocked due to the construction and trenching necessary for the installation of an industrial wastewater line.<\/p>\n<p>From Monday, February 25<sup>th<\/sup> through Tuesday, February 26<sup>th<\/sup>, \u201cI\u201d Street between 6<sup>th<\/sup> Avenue and 1<sup>st<\/sup> Street will be closed to all through traffic.\u00a0 Crews from TTC Construction, a Yakima-based contracting firm, will be working in the \u201cI\u201d Street area to install the 12-inch diameter line.<\/p>\n<p>A crew will also be working on the project on \u201cJ\u201d Street between 6<sup>th<\/sup> Avenue and 8<sup>th<\/sup> Avenue. \u00a0\u201cJ\u201d be closed to through traffic from Monday, February 25<sup>th<\/sup> through Friday, March 1<sup>st<\/sup>.<\/p>\n<p>Traffic controls will be in place while the project is underway to help drivers navigate to detour routes for both \u201cI\u201d Street and \u201cJ\u201d Street.<\/p>\n<p>While work is ongoing, traffic delays in the project areas are likely to occur.\u00a0 Drivers should use alternate routes if possible until the projects are completed.<\/p>\n<p>Access to businesses in the areas will be maintained and emergency vehicles will be allowed through the project areas if necessary.<\/p>\n<p>As always, the schedule for these types of projects is subject to change daily, dependent on weather, equipment failure, and emergencies.<\/p>\n<p>For additional information regarding these projects, contact Utility Engineer Shelley Willson at 576-6303.<\/p>\n<p><a href=\"https:\/\/www.yakimawa.gov\/media\/news\/wp-content\/blogs.dir\/6\/files\/sites\/6\/Wastewater-Line-Installation-2-21-13.pdf\">Wastewater Line Installation (pdf)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contact: Utility Engineer Shelley Willson \u2013 576-6303 Community Relations Manager Randy Beehler \u2013 901-1142 \u2013 randy.beehler@yakimawa.gov \u201cI\u201d Street between 6th Avenue and 1st Street will be open to \u201cLocal Traffic Only\u201d on Saturday, February 23rd and Sunday, February 24th, 2013.\u00a0 The center of the roadway will be blocked due to the construction and trenching necessary<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-73","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/73","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/comments?post=73"}],"version-history":[{"count":3,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/73\/revisions"}],"predecessor-version":[{"id":1635,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/posts\/73\/revisions\/1635"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/media?parent=73"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/categories?post=73"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/news\/wp-json\/wp\/v2\/tags?post=73"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}