{"id":339,"date":"2019-03-25T16:02:16","date_gmt":"2019-03-25T23:02:16","guid":{"rendered":"https:\/\/www.yakimawa.gov\/media\/stories\/?page_id=339"},"modified":"2019-03-25T16:02:16","modified_gmt":"2019-03-25T23:02:16","slug":"north-1st-street-revitalization-phase-1","status":"publish","type":"page","link":"https:\/\/www.yakimawa.gov\/media\/stories\/north-1st-street-revitalization-phase-1\/","title":{"rendered":"North 1st Street Revitalization &#8211; Phase 1"},"content":{"rendered":"\n\n\n<p style=\"font-size:24px;text-align:center\"><strong>Phase 1 of North 1st Street Revitalization Project begins<\/strong><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-media-text alignwide\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/www.yakimawa.gov\/media\/stories\/wp-content\/blogs.dir\/7\/files\/sites\/7\/2019\/03\/IMG_0061-1024x575.jpg\" alt=\"\" class=\"wp-image-342\" srcset=\"https:\/\/www.yakimawa.gov\/media\/stories\/wp-content\/blogs.dir\/7\/files\/sites\/7\/2019\/03\/IMG_0061-1024x575.jpg 1024w, https:\/\/www.yakimawa.gov\/media\/stories\/wp-content\/blogs.dir\/7\/files\/sites\/7\/2019\/03\/IMG_0061-300x169.jpg 300w, https:\/\/www.yakimawa.gov\/media\/stories\/wp-content\/blogs.dir\/7\/files\/sites\/7\/2019\/03\/IMG_0061-768x431.jpg 768w, https:\/\/www.yakimawa.gov\/media\/stories\/wp-content\/blogs.dir\/7\/files\/sites\/7\/2019\/03\/IMG_0061-1250x702.jpg 1250w, https:\/\/www.yakimawa.gov\/media\/stories\/wp-content\/blogs.dir\/7\/files\/sites\/7\/2019\/03\/IMG_0061-400x225.jpg 400w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"has-medium-font-size\">The first of 3 phases for the project, Phase 1 covers U.S. Highway 12 to N Street. Phase 1 work began in March 2019 with crews excavating aging utility lines (water, sewer, stormwater), which are being replaced as part of the revitalization project. <br>The project includes reconstructing the North 1<sup>st<\/sup> Street roadway, rebuilding sidewalks, installing new lighting, building new median islands, redirecting utility lines, and enhancing landscaping.<\/p>\n<\/div><\/div>\n\n\n\n<p style=\"text-align:center\"><br><\/p>\n\n\n\n\n\n<p>Phase 1 is estimated to cost about $3.3 million and is being paid for mostly with federal and state funds.&nbsp; Phase 1 is scheduled to be completed by the end of 2019.<\/p>\n\n\n\n<p>\u00a0\u00a0 <\/p>\n\n\n\n<div class=\"wp-block-media-text alignwide\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"555\" height=\"412\" src=\"https:\/\/www.yakimawa.gov\/media\/stories\/wp-content\/blogs.dir\/7\/files\/sites\/7\/2019\/03\/north-1st-street.jpg\" alt=\"\" class=\"wp-image-382\" srcset=\"https:\/\/www.yakimawa.gov\/media\/stories\/wp-content\/blogs.dir\/7\/files\/sites\/7\/2019\/03\/north-1st-street.jpg 555w, https:\/\/www.yakimawa.gov\/media\/stories\/wp-content\/blogs.dir\/7\/files\/sites\/7\/2019\/03\/north-1st-street-300x223.jpg 300w, https:\/\/www.yakimawa.gov\/media\/stories\/wp-content\/blogs.dir\/7\/files\/sites\/7\/2019\/03\/north-1st-street-400x297.jpg 400w\" sizes=\"auto, (max-width: 555px) 100vw, 555px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"has-medium-font-size\"><br>The North 1<sup>st<\/sup> Street Revitalization Project is intended to improve safety for drivers and pedestrians and increase the economic development potential of the North 1<sup>st<\/sup> Street corridor, one of the main entrances to the city. <\/p>\n\n\n\n<p class=\"has-medium-font-size\"><br>This 3-phase project includes the complete reconstruction of nearly 1.5 miles of North 1st Street, a principal arterial.<\/p>\n<\/div><\/div>\n\n\n\n<p style=\"text-align:center\"> <\/p>\n\n\n\n<p> <\/p>\n\n\n\n\n\n<div style=\"height:21px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p style=\"text-align:center\">The project will remove on-street parking; street lighting will be enhanced and changed over to LED lighting, add pedestrian lighting; construct many 100 foot segments of boulevard median islands; install various pedestrian and decorative elements such as enhanced landscaping along the side of the roadway. Bike facilities will be added to 1st Street which connects to a regional bicycle and pedestrian trail<\/p>\n\n\n","protected":false},"excerpt":{"rendered":"<p>Phase 1 of North 1st Street Revitalization Project begins The first of 3 phases for the project, Phase 1 covers U.S. Highway 12 to N Street. Phase 1 work began in March 2019 with crews excavating aging utility lines (water, sewer, stormwater), which are being replaced as part of the revitalization project. The project includes<\/p>\n","protected":false},"author":10,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"template-custom.php","meta":{"footnotes":""},"class_list":["post-339","page","type-page","status-publish","hentry"],"featured_image_src":null,"featured_image_src_square":null,"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/media\/stories\/wp-json\/wp\/v2\/pages\/339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/media\/stories\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/media\/stories\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/stories\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/media\/stories\/wp-json\/wp\/v2\/comments?post=339"}],"version-history":[{"count":29,"href":"https:\/\/www.yakimawa.gov\/media\/stories\/wp-json\/wp\/v2\/pages\/339\/revisions"}],"predecessor-version":[{"id":386,"href":"https:\/\/www.yakimawa.gov\/media\/stories\/wp-json\/wp\/v2\/pages\/339\/revisions\/386"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/media\/stories\/wp-json\/wp\/v2\/media?parent=339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}