{"id":59,"date":"2012-06-15T03:50:55","date_gmt":"2012-06-15T10:50:55","guid":{"rendered":"https:\/\/www.yakimawa.gov\/services\/engineering\/?page_id=59"},"modified":"2025-06-17T14:39:13","modified_gmt":"2025-06-17T21:39:13","slug":"water","status":"publish","type":"page","link":"https:\/\/www.yakimawa.gov\/services\/engineering\/water\/","title":{"rendered":"Water Standard and Specs"},"content":{"rendered":"<p>Latest details revised May 2025 unless otherwise specified. All Documents are provided in PDF format.<\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W01-05-21-25.pdf\" target=\"_blank\" rel=\"noopener\">W1 &#8211; Hydrant Assembly<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W02-05-21-25.pdf\" target=\"_blank\" rel=\"noopener\">W2 &#8211; Water Valve Box<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W3.pdf\" target=\"_blank\" rel=\"noopener\">W3 &#8211; Typical Trench Section<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W04-6-17-25.pdf\" target=\"_blank\" rel=\"noopener\">W4 &#8211; Typical Intersection Layout<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W05-1-2025.pdf\" target=\"_blank\" rel=\"noopener\">W5 &#8211; Typical Blow Off Assembly<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W6.pdf\" target=\"_blank\" rel=\"noopener\">W6 &#8211; Typical Concrete Blocking<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W07-1-2025-v3.pdf\" target=\"_blank\" rel=\"noopener\">W7 &#8211; Fire Hydrant Bollard Detail<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W08-05-21-25.pdf\" target=\"_blank\" rel=\"noopener\">W8 \u2013 Air-Vacuum Relief Valve<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W09-05-21-25.pdf\" target=\"_blank\" rel=\"noopener\">W9 &#8211; Compound Meter Install<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W10-05-21-25.pdf\" target=\"_blank\" rel=\"noopener\">W10 \u2013 1 1\/2\u2033 &amp; 2\u2033 Meter Installation<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W11-05-21-25.pdf\" target=\"_blank\" rel=\"noopener\">W11 \u2013 Install Requirements for DCA\u2019s<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W12-05-21-25.pdf\" target=\"_blank\" rel=\"noopener\">W12 \u2013 Install Requirements for DCDA\u2019s<\/a><\/li>\n<li>W13 &#8211; Not Used<\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W14-05-21-25.pdf\" target=\"_blank\" rel=\"noopener\">W14 &#8211; 3\/4&#8243; &amp; 1&#8243; Meter Installation<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/W15-1.pdf\" target=\"_blank\" rel=\"noopener\">W15 &#8211; Tapping Procedure Detail<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/Water-System-Standard-Specification-2017.pdf\">Standard Specifications for Water Improvements<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/Waterline-Separation-Standards-2017.pdf\">Yakima Water Separation Standards<\/a><\/li>\n<li><a href=\"https:\/\/www.yakimawa.gov\/services\/engineering\/files\/Water-Gen.-Constr.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Public Waterline General Notes<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Latest details revised May 2025 unless otherwise specified. All Documents are provided in PDF format. W1 &#8211; Hydrant Assembly W2 &#8211; Water Valve Box W3 &#8211; Typical Trench Section W4 &#8211; Typical Intersection Layout W5 &#8211; Typical Blow Off Assembly W6 &#8211; Typical Concrete Blocking W7 &#8211; Fire Hydrant Bollard Detail W8 \u2013 Air-Vacuum Relief<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-59","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/services\/engineering\/wp-json\/wp\/v2\/pages\/59","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/services\/engineering\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/services\/engineering\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/services\/engineering\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/services\/engineering\/wp-json\/wp\/v2\/comments?post=59"}],"version-history":[{"count":34,"href":"https:\/\/www.yakimawa.gov\/services\/engineering\/wp-json\/wp\/v2\/pages\/59\/revisions"}],"predecessor-version":[{"id":2087,"href":"https:\/\/www.yakimawa.gov\/services\/engineering\/wp-json\/wp\/v2\/pages\/59\/revisions\/2087"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/services\/engineering\/wp-json\/wp\/v2\/media?parent=59"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}