{"id":20,"date":"2012-06-15T07:55:03","date_gmt":"2012-06-15T14:55:03","guid":{"rendered":"https:\/\/www.yakimawa.gov\/services\/streets\/?page_id=20"},"modified":"2014-04-16T11:44:33","modified_gmt":"2014-04-16T18:44:33","slug":"street-maintenance-pavement-surface-inventory","status":"publish","type":"page","link":"https:\/\/www.yakimawa.gov\/services\/streets\/street-maintenance-pavement-surface-inventory\/","title":{"rendered":"Street Surface Inventory &amp; Condition"},"content":{"rendered":"<table>\n<tbody>\n<tr>\n<td>\u00a0<img loading=\"lazy\" decoding=\"async\" alt=\"\" src=\"\/images\/seal.png\" width=\"121\" height=\"121\" \/><\/td>\n<td style=\"padding-left: 30px;\">City of Yakima, Washington Department of Public Works<br \/>\nStreets and Traffic Division<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The Street Division\u2019s annual maintenance program includes small repaving projects, wheel path grinding and patching, pothole repair, alley grading, crack filling and chip-sealing.\u00a0Street maintenance operations provide a cost-effective program which protects the public investment in city streets although recent budget limitations has reduced the amount of preventive maintenance work that can be accomplished.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><span style=\"text-decoration: underline;\">Inventory<\/span><\/strong><\/p>\n<p>325 miles of paved roadways + 44 miles of alleys<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 802 Lane Miles<\/p>\n<ul>\n<li>318 Lane Miles Classified Roadways<\/li>\n<li>484 Lane Miles Local Streets<\/li>\n<\/ul>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Pavement Types<\/p>\n<ul>\n<li>Asphalt Concrete \u2013 94.5 %<\/li>\n<li>Portland Cement Concrete \u2013 2.5 %<\/li>\n<li>Bituminous Surface \u2013 3.0 %<\/li>\n<\/ul>\n<p><strong><span style=\"text-decoration: underline;\">Condition<\/span><\/strong><\/p>\n<p><strong>\u00a0<\/strong>Existing Pavement Condition Index \u2013 54.5<\/p>\n<p>67 % of streets in Fair or better condition (PCI &gt; 40)<\/p>\n<p>2022 Pavement Condition Index @ existing funding level \u2013 19.0<\/p>\n<p>99% of streets below Fair condition (PCI &lt; 40)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 City of Yakima, Washington Department of Public Works Streets and Traffic Division The Street Division\u2019s annual maintenance program includes small repaving projects, wheel path grinding and patching, pothole repair, alley grading, crack filling and chip-sealing.\u00a0Street maintenance operations provide a cost-effective program which protects the public investment in city streets although recent budget limitations has<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-20","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.yakimawa.gov\/services\/streets\/wp-json\/wp\/v2\/pages\/20","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yakimawa.gov\/services\/streets\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.yakimawa.gov\/services\/streets\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/services\/streets\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yakimawa.gov\/services\/streets\/wp-json\/wp\/v2\/comments?post=20"}],"version-history":[{"count":0,"href":"https:\/\/www.yakimawa.gov\/services\/streets\/wp-json\/wp\/v2\/pages\/20\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.yakimawa.gov\/services\/streets\/wp-json\/wp\/v2\/media?parent=20"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}