Water Standard and Specs
Latest details revised January 2025 unless otherwise specified. All Documents are provided in PDF format.
-
- W1 – Hydrant Assembly
- W2 – Water Valve Box
- W3 – Typical Trench Section
- W4 – Typical Intersection Layout
- W5 – Typical Blow Off Assembly
- W6 – Typical Concrete Blocking
- W7 – Fire Hydrant Bollard Detail
- W8 – Air-Vacuum Relief Valve
- W9 – Compound Meter Install
- W10 – 1 1/2″ & 2″ Meter Installation
- W11 – Install Requirements for DCA’s
- W12 – Install Requirements for DCDA’s
- W13 – Not Used
- W14 – 3/4″ & 1″ Meter Installation
- W15 – Tapping Procedure Detail