Tree Trimming on Wide Hollow Road to Affect Drivers

Tree trimming along Wide Hollow Road will result in the closure of a portion of the eastbound lane of the street for most of the day on Thursday, May 29th. City of Yakima crews will be cutting back branches on trees along the roadway to improve safety in the area. As a result, the eastbound


Repaving of One Lane Will Interrupt Tieton Drive Traffic

Traffic on Tieton Drive between 59th Avenue and 72nd Avenue will be intermittently interrupted each day from Wednesday, May 28th through Friday, May 30th and again from Monday, June 2nd through Wednesday, June 4th while the westbound, outside lane of that section of Tieton is repaved.   Traffic on Tieton Drive between 59th Avenue and


Old Drain Removal Will Temporarily Affect Maclaren Irrigation System

The removal of an old drain will result in the temporary shutdown of the City of Yakima’s Maclaren Irrigation System during the day on Thursday, May 29th. The result of the temporary shutdown will likely be reduced irrigation water pressure to the homes served by the Maclaren system for a few hours that day. The


Citywide Road Resurfacing Project Update

A citywide street repaving project that began earlier this month and will continue until this fall will affect traffic in several areas of Yakima from May 26th through May 30th. From Tuesday, May 27th through Friday, May 30th, periodic lane closures will occur each day from 6:00 am to 4:00 pm on 40th Avenue between


You Can Help Yakima Win $100,000 for a Dog Park

It’s time for all Yakima dog lovers to sit (or stand) and speak (electronically, that is) to help Yakima win $100,000 for a planned dog park by becoming the “Top Dog” in an online contest appropriately named “Bark for Your Park”. To earn the Top Dog distinction and win the grand prize, which would be


City of Yakima Bond Rating Upgrade Will Save Taxpayer Dollars

Based on what it described in a recently released report as very strong budgetary flexibility, strong budgetary performance, and strong management, Standard and Poor’s (“S&P”) elevated the City of Yakima’s general obligation debt rating from A+ (A plus) to AA- (Double A minus). The net result of the upgraded bond rating is that the City


Citywide Road Resurfacing Project Update

An ambitious street repaving project that kicked off May 12th will affect traffic in several areas of Yakima during the week of May 19th through May 23rd. From Monday, May 19th through Friday, May 23rd, periodic lane closures will occur each day from 6:00 am to 4:00 pm on 40th Avenue between Fruitvale Boulevard and


May 2014 City of Yakima Issues Brief e-Newsletter

In the May 2014 edition of the City of Yakima Issues Brief e-Newsletter – Yakima Transit Test Driving Battery-Powered Bus – MLK, Jr. Blvd Underpass Heading Toward Completion – Free Music and Movies Back in Yakima Parks This Summer. May 2014 Issues Brief


Tree Trimming on Powerhouse Road to Affect Drivers

Tree trimming along Powerhouse Road will result in the closure of a portion of the street on Thursday, May 15th. City of Yakima crews will be cutting back branches on trees along the North side of Powerhouse to improve safety in the area. As a result, the portion of Powerhouse from the intersection of Lincoln


Citywide Road Resurfacing Project Getting Underway

An ambitious street repaving project that will result in more than 90 lane miles of roads in Yakima being resurfaced kicks off on Monday, May 12th along a section of 40th Avenue and a portion of Lincoln Avenue. The City is spending about $15 million dollars this year completing what’s known as a “grind and